Wednesday, March 9, 2011

6 Weeks Solar Production

We set another new daily production high of 10.33 KWH. Our rolling 30-day average production is 230 KWH, which is higher than the target average of 228.6 KWH to achieve the CSI estimated annual production for our system.

Total After 6 Weeks:
Production: 311 KWH
CO2 Saved: 521 lbs
Estimated Savings: $62.20

System Size DC (STC): 2.28KW
System Size AC: 1.93KW
System Size AC (California CSI rating): 1.63KW
Panels: 10 Sunpower Serengeti 228 Watt
Inverter: 1 Sunpower 3000M (SMA Sunny Boy 3000 rebranded under Sunpower)
Estimated Annual Production: 2,781 KWH
Direction: East facing