3 Weeks Solar Production

We had problems getting our monitoring system up and running during the first week, so I had to run outside and check the system every day. Now that it's working, I can check it from the internet - so much better. See my daily production chart.

After 3 Weeks:
Production: 147.0 KWH
CO2 Saved: 249.9 lbs
Estimated Savings: $29.40

System Size DC (STC): 2.28KW
System Size AC: 1.93KW
System Size AC (California CSI rating): 1.63KW
Panels: 10 Sunpower Serengeti 228 Watt
Inverter: 1 Sunpower 3000M (SMA Sunny Boy 3000 rebranded under Sunpower)
Estimated Annual Production: 2,781 KWH
Direction: East facing

Installer: Martifer Solar (Matt Rakocija)